LVLS ordered. Delivery expected a week out.
Changing electrical runs in the basement to not interfere with LVL location is more work than I thought. Not so much the re-routing of existing homeruns, but re-feeding runs on the main floor that stopped in octagon junction boxes before going to the next floor. WHY?!
The house was built in 1968, so it seems every update made was in the form of feeding a basement junction and branching from there to the main floor.
Affected are:
Garburator
Dishwasher
Counter Cooktop (Spliced # 8s -WHY?!
)
Garage feed (which is on the same homerun as the bonus room on the main floor
)
Microwave
In-Cabinet Range
I also have to fish in another dedicated 20A counter plug and re-feed the fridge- as there are no dedicated branches for kitchen counters. Things have changed since ole '68. Weekend mornings making toast and coffee at the same time result in the circuit tripping if the fridge compressor decides to play too.
Last but not least, all 4ft fixtures in the basement stopped in a junction and T off to the next light before feeding the fixture. Not a big deal, but strange.
Although the service is 100A, an upgrade to a modern 100A or 200A service is definitely in the cards. Haven't decided which yet. It may be nice to have the option to run a heatpump or instant hot water baseboards in the future.
BTW the existing panel is the definition of cheating. In every way. Oh how things have changed.