Slow progress, but here is the wall all framed out.



Think I went a little over board with enforcing the wall...lol. Never got a chance to run the wires, got caught up ripping down the basement ceiling (sheet rock right to the studs). Works out cause I ordered more wiring, gonna run two cat5, HDMI, component, and USB to the TV, and 10/2 to all the speakers :).

Oh and fireplace materials should be in around two weeks. Slow and steady wins the race :).